cici@vip.icbros.com +852 44058386
Facebook
X
Pinterest
Youtube
Instagram
WhatsApp
Skype
  • QR Code
ICBROS TECHNOLOGY LIMITED
  • Home
  • -Services-
  • -Manufacturing-
    • Factory Overview
    • SMT Assembly
    • DIP Assembly
    • Testing Equipment
    • Conformal Coating
    • Final Assembly
  • -Industries-
  • -Quality-
  • -Contact-

News

Home News Intel showcases Meteor Lake processor pr...

Intel showcases Meteor Lake processor prototype: 16 cores, 22 threads, L3 cache 24M

Intel showcased a prototype of a Meteor Lake-H processor and the VPU part of SoC at this year's Computex 2023 Taipei Computer Show.

It has 1.6 MB of L1 cache, 18 MB of L2 cache, and 24 MB of L3 cache. Due to the early generation Intel 4 technology, the main frequency of the Meteor Lake processor seems to be at a low level, with a base frequency of only 3.1 GHz, while this ES processor even has an idle frequency of only 0.37 GHz.

Intel Meteor Lake 16 core, 22 threaded, and 3.1 GHz

Intel stated that the chips on the Meteor Lake SoC are three generations ahead of Movidius, but have the same IP (which is why the task manager detects them as Movidius NPUs). In addition, we can also see that the VPU will use approximately 1 GB of shared vRAM memory to complete its work.

Intel Meteor Lake - All filters run on VPU

ICBROS TECHNOLOGY LIMITED is a worldwide professional electronic components distributor.

Web:https://www.icbros.com
Email:service@icbros.com
#DAC #pcbuild #icbros #analogelectronics #semimodular #preamplifier #elettronica #supercon #pcbengineer #diyelectronics #eletricistas #emeddedsystems #hobielektronik #electricalprojects #components #makers #engineering #irremote #studentproject #pic24 #eletronica #drscientist #universalrobots #circuitplayground #powersupply #arduinocompatible

Related News

Our hot chip models today 3

Our hot chip models today 3

Samsung Galaxy Watch 6/Pro smart watch will be designed with curved glass screen

Samsung Galaxy Watch 6/Pro smart watch will be designed with

How semiconductors achieve a sustainable energy future

How semiconductors achieve a sustainable energy future

Intel issued a temporary patch to fix the intermittent network disconnection of I225, I226 and other network cards

Intel issued a temporary patch to fix the intermittent netwo

Function and Application of Microcomputer Relay Protection Tester

Function and Application of Microcomputer Relay Protection T

The Galaxy S23 series upgrade was updated in February, and the new problems: too fast power consumption, fast charging failure, etc

The Galaxy S23 series upgrade was updated in February, and t

Product Categories

  • Factory Overview
  • SMT Assembly
  • DIP Assembly
  • Testing Equipment
  • Conformal Coating
  • Final Assembly
  • Factory Overview
  • SMT Assembly
  • DIP Assembly
  • Testing Equipment
  • Conformal Coating
  • Final Assembly

Links

内页左侧广告1

LatestPost

Feedback

Contact Us

85244058386

+852 44058386

cici@vip.icbros.com

live:.cid.497a4afb2eba768b

5/F, Ming Sang Industrial Building, No 21 Hing Yip Street,Kwun Tong, Kowloon, Hong Kong, 15th Floor, World Trade Building, Futian District, Shenzhen, China

MOBILE WEBSITE

Copyright © 2013-2026 All Rights Reserved.

WhatsApp
Phone
E-mail
Inquiry
  • +852 44058386
  • cici@vip.icbros.com
  • 85244058386
  • WeChat QR Code
  • Back to Top
Inquiry Us Now !
Inquiry Us Now !